Towage Guidelines for BP Hamble (BPJ)
Towage Guidelines for BP Hamble (BPJ)
Choice Pilotage is required on all vessels over 60,000 DWT. Such vessels will have a minimum of four tugs for arrival and a minimum of three tugs for departure except where the pilot and terminal agree to dispense with one tug when the vessel is fitted with bow / stern thrusters which allow greater manoeuvrability.
Inbound and outbound vessels greater than 60,000 displacement tonnage shall have an escort tug for that passage.
Minimum tug requirement:
| Vessel DWT | Inbound | Outbound |
| < 16,000t | Pilot Discretion | Pilot Discretion |
| 16,000 - 17,999t | 2 | 1 |
| 18,000 - 49,999t | 2 | 2 |
| 50,000 - 59,999t | 3 | 3 |
| > 60,000t | 4 | 3 |
Mooring Boats
| LOA | No of Boats |
| < 87m | None |
| 88m - 120m | One |
| > 120m | Two |